Completed projects KERAMAX

Completed projects

Otkrytie Arena stadium of FC Spartak in Moscow
Otkrytie Arena stadium of FC Spartak in Moscow
Otkrytie Arena stadium of FC Spartak in Moscow, the construction was completed in 2014The total area of the stadium is 53,758 sq. m. This state-of-the-art stadium is almost 53 meters high and can accommodate over 45,000 people. Field size is 105 * 68 m.
Pavshinskaya Poima - Myakinino Bridge in Moscow
Pavshinskaya Poima - Myakinino Bridge in Moscow
Cable-stayed footbridge in the capital across the Moskva River in the Pavshinskaya Poima area and Crocus City trade and exhibition complex, the construction was completed in 2014.The length of the Pavshinsky (Spassky) bridge is 430 m, the width is 5 m.
Bugrinsky bridge across the river Ob in Novosibirsk
Bugrinsky bridge across the river Ob in Novosibirsk
Bugrinsky bridge across the river Ob in Novosibirsk, the construction was completed in 2014. The total length of the bridge with approaches is 2,091 m, the bridge is designed for 6 traffic lanes. The capacity of the bridge is 7,180 vehicles per hour. The bridge provided continuous traffic between the M-51 "Baikal" and M-52 "Chuisky tract" highways.
Highway bridge over the river Tura
Highway bridge over the river Tura
Highway bridge over the river Tura with a traffic interchange on the Dambovskaya street of the ring road in Tyumen, the construction was completed in 2015.The 345 m long bridge is designed for 6 traffic lanes, 3 in each direction, the width of each lane is 3.5 m.
Bridge crossing over the river Nadym
Bridge crossing over the river Nadym
Bridge crossing over the river Nadym of the Northern Latitudinal Corridor railway in the Yamalo-Nenets Autonomous Okrug, the construction was completed in 2015.It is an element of the Northern Latitudinal Railway, which will connect the Arctic with the center of Russia and the Urals.
The total length of the bridge is 3,100 m including the bridge itself (1334 m) and sections of approaches (1770 m).The length of the superstructure is 110 m.
The bridge over the river Vakh on the Nizhnevartovsk - Strezhevoy highway
The bridge over the river Vakh on the Nizhnevartovsk - Strezhevoy highway
Bridge crossing over the river Vakh on the Nizhnevartovsk - Strezhevoy highway in the village of Izluchinsk in Khanty-Mansiysk Autonomous Okrug, the construction was completed in 2014.Bridge crossing over the river Vakh connected the city of Nizhnevartovsk with the city of Strezhevoy in the Tomsk region. The total length of the bridge is about 8,000 m. The carrying capacity of the bridge is 5,500 vehicles per day.